Latest update
Apr 2026
Myrtha Pools rides the wave of surf innovation at ADRENA Red Sea
The pool was refurbished and brought up to 2012 standards. The pool had a existing diving hopper area which was filled in to re-program the pool depth.
Project Team: Installation Contractor - DWR Construction, Inc.; General Contractor - DWR Construction, Inc.; Aquatic Consultant - Arch Pac Aquatics
Type
City
Technology
Surface
25 m (Length)
Location